Aerospace & Space Watch · November 17, 2026
ULA's Vulcan Failure Costs Amazon 40 Satellites, SpaceX Catches Starship's Upper Stage, NASA Opens a $10 Billion Lunar Framework and Boeing Wins a Dreamliner Order
|
THE CODEW · Partner Intelligence
Ship better with data and AI skills
Hands-on Python, SQL, and AI learning from DataCamp, for technical teams and founders who want to build with data.
> python · sql · data analysis · ai
|
Run DataCamp → |
The Companies Behind the Launch, Satellite, Lunar and Airline Economy
Welcome to the first edition of Aerospace & Space Watch, The CODEW's daily briefing on the companies, technologies, investments and strategic shifts shaping the global aerospace and space economy. The biggest development is United Launch Alliance's Vulcan failure on November 15, which destroyed 40 Amazon Leo satellites and was the first mission loss in ULA's history. In the same days, SpaceX caught the upper stage of Starship after an orbital flight for the first time, NASA's lunar delivery framework opened to eight providers, and Philippine Airlines firmed a 15-aircraft Boeing 787-10 order.
Editorial Note: The Vulcan failure (November 15) and Starship's catch (November 14) are the latest developments. The NASA CLPS 2 selection is from November 7 and the Philippine Airlines agreements were signed November 10, so both are labeled as earlier events. Space Tech Expo Europe opens today. Developing stories are marked as such.
Top Industry News
United Launch Alliance Loses 40 Amazon Leo Satellites in Vulcan's First Mission Failure
November 15, 2026. Developing story: the cause is under investigation.
| Status | Developing; ULA has not identified a cause |
| Launch | Vulcan Centaur from Cape Canaveral Space Force Station, 12:40 p.m. ET on November 15; mission LV-01 |
| Failure | Anomaly about 10 minutes into flight; the rocket "failed to deliver the Amazon mission to orbit" (ULA) |
| Payload lost | 40 Amazon Leo broadband satellites, the largest payload Amazon had flown on a single Leo mission |
| Significance | First mission failure in ULA's history since Boeing and Lockheed Martin formed the company in 2006 |
| Investigation | Blue Origin, which supplies Vulcan's BE-4 booster engines, is assisting |
What happened: United Launch Alliance's Vulcan Centaur rocket suffered an anomaly about ten minutes after liftoff on November 15 and failed to reach orbit, destroying 40 satellites for Amazon's Leo constellation. It was the first launch under Amazon's agreement for 38 Vulcan flights, and was meant to be a return-to-flight mission after an earlier booster problem on another mission in February. Reports indicate the failure came after the upper stage separated from the booster, and the solid rocket boosters appeared to perform as expected, but ULA has given no cause and the details should be treated as preliminary.
ULA and its customers: ULA is owned jointly by Boeing and Lockheed Martin and built its reputation on a clean record. Vulcan is intended to replace Atlas V and Delta IV, principally for national security launches, and Reuters-sourced coverage notes the Pentagon had been waiting on this flight before clearing Vulcan to carry national security satellites again. A failure-review period could keep Vulcan grounded for months and push back the certification and flights that depend on it, including planned launches from Vandenberg in 2027. ULA's Atlas V is still flying Leo satellites and remains available.
Amazon Leo's schedule: Before this flight Amazon had launched 398 Leo satellites on 14 missions, about 12% of the roughly 3,236 required for global service, according to Reuters as cited by the press. The loss removes 40 more and delays the use of its largest launch contract. Amazon has other launches arranged, including an Ariane 6 mission listed for November 23 and New Glenn flights planned for 2027, but Vulcan was supposed to carry the bulk of the deployment. Starlink, by contrast, has more than 11,000 satellites in orbit and millions of customers.
Why it matters: The failure is more than a launch incident. It tests reliability expectations for a new heavy-lift vehicle, exposes the concentration of Amazon's deployment plans on two providers that are both still maturing, and strengthens the advantage of SpaceX, which launches its own satellites on its own rockets. The commercial and national security consequences depend on what the investigation finds.
Evidence status: Company statement from ULA via Amazon Leo (November 15), Reuters-sourced reporting and trade coverage. Cause and schedule impact are unconfirmed. Connect to: Company Intelligence · Technology Intelligence
SpaceX Catches Starship's Upper Stage for the First Time as It Pushes Toward Full Reusability
Flight 15 launched November 13 and the catch occurred November 14, 2026.
| Mission | Starship Flight 15 from Starbase, Texas, with Ship 42 |
| Milestone | First time an orbital Starship upper stage was caught by the launch tower's arms |
| Flight profile | About 22.5 hours and 14 orbits at roughly 275 km altitude |
| Payload | 26 Starlink V3 satellites deployed; three carried cameras to image the heat shield |
| Booster | Not recovered as planned; reported destroyed during descent into the Gulf |
| Previous flight | Flight 14 on September 28 deployed 26 Starlink V3 satellites in what SpaceX described as its first revenue-generating Starship mission |
What happened: SpaceX launched Starship Flight 15 on the evening of November 13, completed 14 orbits, deployed 26 Starlink V3 satellites, and brought Ship 42 back to Starbase, where the launch tower's "chopstick" arms caught it on November 14. SpaceX had caught its Super Heavy booster three times before, but never the upper stage after a full orbital re-entry. The booster on this flight did not complete its planned recovery and was lost in the Gulf.
SpaceX pulls off something it’s never done before, catching a massive Starship spacecraft in midair after it spends nearly an entire day orbiting Earth. The spacecraft completes 14 laps around the planet before descending toward its Texas launch site, where giant mechanical arms grab it above the ground. But the historic achievement comes with a major setback. The rocket’s booster exploded during the mission, leaving Elon Musk’s team with a breakthrough and a new problem to investigate. The catch makes history, but what happened to the booster? See how the mission unfolded and what’s next for SpaceX: https://t.co/sWnNBgelrG
— Fox News (@FoxNews) November 15, 2026
Why the catch matters: A caught ship returns straight to the launch site, skipping sea recovery and enabling fast turnaround: restack, refuel, load satellites and fly again. That is the core of SpaceX's strategy of fully reusable launch, which targets lower launch cost and higher flight frequency. The catch is not yet proof of reuse, because the ship has not been re-flown, and a lost booster shows how much of the system is still being proven.
The wider business: Starship is central to Starlink's next generation. SpaceX says each V3 satellite adds about one terabit of capacity and that this batch equals roughly ten Falcon 9 launches of the previous generation, which is a company claim. Starship also underpins SpaceX's lunar role: NASA named it among eight CLPS 2 providers and separately selected SpaceX to launch cislunar communications satellites on Starship in 2028 (see story 3). Reusability, Starlink and lunar transport form an integrated business that no other launch company currently matches.
Evidence status: Company and press reports, November 13 to 15. Capacity and economics claims are SpaceX's own; reuse of a caught ship has not yet been demonstrated. Connect to: Company Intelligence · Technology Intelligence
NASA Selects Eight Companies for a $10 Billion Lunar Delivery Framework
Announced November 7, 2026 at Kennedy Space Center. This is earlier news, included for context.
| Program | Commercial Lunar Payload Services 2 (CLPS 2): 10-year, multiple-award, indefinite-delivery/indefinite-quantity contract |
| Ceiling | $10 billion combined maximum, not money already awarded |
| Eight providers | Blue Origin, Firefly Aerospace, Intuitive Machines, ispace-U.S., Lockheed Martin Space, Northrop Grumman Space Systems, SpaceX and Voyager Technologies |
| Existing contract | CLPS 1.0 ceiling raised from $2.6 billion to $4.2 billion |
| Related awards | About $1.3 billion in task orders under a $5 billion launch contract; Blue Origin to deliver a nuclear-powered rover, PROMISE |
What happened: NASA said on November 7 that eight companies are eligible to compete for lunar surface delivery missions under CLPS 2 and will manage, build and operate landers carrying NASA payloads. The assignment lists seven names; the eighth is Voyager Technologies. NASA stressed that the $10 billion is a combined ceiling, so revenue for any company depends on task orders that have not yet been announced, and a space-industry analysis noted it averages about $1 billion a year shared among the eight.
Related awards: NASA also raised the original CLPS ceiling to $4.2 billion for the first phase of its Moon Base program. It awarded Blue Origin a $94 million base contract, with a $140 million performance option, to deliver the PROMISE nuclear-powered rover to the lunar south pole from late 2028, and issued about $1.3 billion in task orders to Arrow Science and Technology, Blue Origin and Impulse Space for Moon Base cargo transport. SpaceX was selected separately to deploy communications satellites on Starship in 2028 as a cislunar communications demonstration.
Why it matters: NASA is building a commercial supplier pool rather than relying on a few contractors, and the mix of newer companies (Firefly, Intuitive Machines, ispace) and large primes (Lockheed Martin, Northrop Grumman, Blue Origin, SpaceX) will compete for each mission. The Moon Base plan targets a permanent outpost by 2032, and the supply chain for landers, launch, power and communications is where commercial opportunity is forming. Because each delivery is competed, some awardees could end up with few missions.
Evidence status: NASA announcement (November 7) and trade reporting. The $10 billion is a maximum value, and no CLPS 2 task orders have been named. Connect to: Company Intelligence · Technology Intelligence
Space Tech Expo Europe Opens in Bremen as Europe's Space Supply Chain Seeks Competitive Footing
November 17–19, 2026, Messe Bremen. The show opens today, so this is a pre-show view.
| Event | Space Tech Expo Europe, Messe Bremen, Hall 5, Bremen, Germany; trade-only |
| Scale | About 1,078 exhibiting and sponsoring companies from 40 countries, per the organizer's published list |
| Speakers | More than 150, from NASA, ESA, the European Commission, EUSPA, DLR, CNES, ASI and JAXA, and companies including ArianeGroup, Airbus Defence and Space, Thales Alenia Space, OHB, Isar Aerospace, Rocket Lab, Planet Labs, Open Cosmos, ICEYE, Exolaunch and D-Orbit |
| Note | Final edition in Bremen after 11 years; the event is moving to Frankfurt |
Who is attending: The exhibitor list covers agencies and primes such as ESA, DLR, CNES and OHB, launch and satellite companies, and a long tail of component and engineering suppliers, including defense specialists such as Israel Aerospace Industries and Terma. The speaker line-up spans launch providers (ArianeGroup, Isar Aerospace, Rocket Lab), satellite makers (Airbus Defence and Space, Thales Alenia Space, OHB), Earth observation operators (ICEYE, Planet Labs) and in-orbit services (D-Orbit, Exolaunch, Open Cosmos).
Competitiveness question: The week's other stories sharpen what is at stake for Europe: American providers are launching reusable heavy-lift vehicles and winning NASA's lunar work, while European launch and supply-chain companies are building capacity and partnerships. Rocket Lab's presence, with a German foothold announced in 2025, illustrates how non-European launch companies are also positioning in the European market. The show's value is as a place where partnerships, supplier contracts and funding are announced; I have not reported specific announcements because the show is only beginning.
What to watch: supply-chain deals among satellite manufacturers and component suppliers, launch-capacity partnerships, and any European funding or procurement signals from ESA and the European Commission.
Evidence status: Organizer, press-office and trade information. No show-floor announcements are reported in this edition. Connect to: Company Intelligence · Semiconductor Intelligence
Philippine Airlines Firms Up Its Boeing 787-10 Order, Its First Direct Boeing Purchase in Nearly Two Decades
Agreements signed November 10, 2026 and reported November 16.
| Order | 15 firm Boeing 787-10 Dreamliners with purchase rights for five more (up to 20) |
| Engines | GE Aerospace GEnx-1B, under a separate agreement |
| Deliveries | From 2031, with deliveries expected through 2034 |
| Estimated value | About $3.4 billion, a press estimate rather than a disclosed price |
| Background | Commitment announced at the Farnborough Airshow on July 20; first direct Boeing order since 2007 |
| Airline fleet today | 10 Boeing 777-300ER, 11 Airbus A330-300 and four Airbus A350s |
What happened: Philippine Airlines formalized its agreements with Boeing and GE Aerospace on November 10, converting the July Farnborough memorandum into a firm contract for 15 Boeing 787-10s, with rights to buy five more. The Boeing deal is PAL's largest widebody order and its first direct Boeing purchase since two 777-300ERs in 2007. The assignment describes the commitment as an order for up to 20; the firm quantity is 15, and the remaining five are purchase rights.
Fleet strategy: PAL's long-haul fleet is mostly Airbus apart from its 777s, and the 787-10 is a new type for it. The 787-10 is the largest Dreamliner, seating about 300 to 375 passengers with range of about 13,890 km. PAL says it will strengthen medium- and long-haul operations, and the airline also signed an MoU at Farnborough the next day for nine more Airbus A350-1000s, so Boeing and Airbus are both part of its widebody plan. It launched a nonstop Manila-Chicago service on November 9. Deliveries do not begin until 2031, so the order is a long-range fleet commitment.
Boeing and GE Aerospace: For Boeing the order adds backlog in Asia-Pacific and in the 787-10, where it competes with Airbus's A350 family. GE Aerospace won the engine competition over Rolls-Royce, which powers PAL's A350s, extending the GEnx-1B on the 787 program. The airline split between the two manufacturers is a reminder that widebody slots are scarce and that carriers diversify supply.
Evidence status: Company announcements and trade reporting (Boeing, PAL, GE Aerospace; FlightGlobal and Airliner World, November 16). Value is a press estimate. Connect to: Company Intelligence · Technology Intelligence
Company Watch
Rocket Lab Posts Record Revenue, but First Neutron Launch Slips to 2027
Third-quarter results reported November 9, 2026.
| Q3 revenue | Record $267.8 million, up 73% year over year |
| Backlog | $3.57 billion, up 52% sequentially |
| Q4 guidance | Revenue of $270 million to $290 million |
| Neutron | First launch delayed to 2027 after a propellant-tank component defect; 16 launches booked, with eight new missions worth more than $515 million |
| Pricing | Base Neutron launch price raised to $70 million on several missions |
What happened: Rocket Lab reported record quarterly revenue and a growing backlog, with its Space Systems business driving growth. It said Neutron's first launch has moved to 2027 after defects were found in a propellant-tank component, and a replacement forward dome has been manufactured but no specific date set. The company says all of its first 16 Neutron launches are contracted, with the next available slots in the 2030s, and Neutron spending weighed on results, with research and development up 39%.
Why it matters: Launch capacity is tight, which supports pricing and bookings for new heavy-lift vehicles, but delays like Neutron's and ULA's Vulcan failure show how hard it is to bring a new rocket into service. All figures are company-reported.
Evidence status: Company-reported results (Rocket Lab, November 9). Connect to: Company Intelligence
Blue Origin Is Part of Three Stories at Once
November 7 to 15, 2026.
| Vulcan | Supplies the BE-4 engines on Vulcan's booster and is assisting the failure investigation |
| NASA CLPS 2 | One of eight selected providers |
| NASA PROMISE rover | $94 million base contract with a $140 million option to deliver the nuclear-powered rover, launch from late 2028 |
| New Glenn | Status not verified in this edition |
Why it matters: Blue Origin is simultaneously a supplier to a competitor (ULA), a bidder for NASA's lunar cargo market and an operator of its own heavy-lift rocket. The Vulcan investigation could put its engines under scrutiny, although no cause has been given. I did not verify current New Glenn flight status for this edition, so none is reported.
Evidence status: NASA announcement and press coverage. No New Glenn development was verified. Connect to: Company Intelligence · Technology Intelligence
| Airbus, GE Aerospace (beyond the PAL engine deal), Anduril, AST SpaceMobile | No verified material development was confirmed for this edition, so they are not covered, in line with the assignment's instruction not to add companies to fill space. |
Industry Intelligence
Launch reliability is a competitive variable. ULA's first failure, on a rocket that Amazon, the Pentagon and NASA all depend on, shows how a single anomaly can ripple through satellite deployment, national security certification and a launch provider's reputation. SpaceX's own launches and its Starship progress widen the gap.
Reusability is becoming the economic center of launch. The ship catch is a step toward rapid turnaround, though reuse of the ship is not yet proven. Rocket Lab's delayed Neutron and its tight capacity show how scarce reusable heavy-lift is.
NASA procurement is shaping a lunar market. CLPS 2 and the related awards put eight providers and several newer entrants into a competed framework with a $10 billion ceiling, and revenue will depend on task orders.
Constellation economics favor the integrated player. Starlink launches on SpaceX rockets and has more than 11,000 satellites, while Amazon Leo, with about 12% of the satellites it needs, relies on several launch providers and has just lost 40.
Airlines are diversifying widebody supply. PAL's split between Boeing and Airbus, with deliveries starting in 2031, shows how long order books and slot scarcity shape fleet strategy.
What's Next
- ULA failure review: the cause, how long Vulcan stays grounded, and the effect on Pentagon certification and Amazon's schedule.
- Amazon Leo's next launches: an Ariane 6 mission with 36 satellites is listed for November 23, and Atlas V flights continue.
- SpaceX Flight 16: timing of the next Starship flight and any attempt to re-fly a caught ship.
- CLPS 2 task orders: which provider wins the first missions and when NASA issues them.
- Space Tech Expo Europe, November 17–19: supply-chain contracts and partnership announcements from Bremen.
- Rocket Lab Neutron: a firm 2027 launch date after the tank defect.
- NASA surface power solicitation: planned for early 2027 under the Moon Base program.
A single launch is news. A company's launch strategy and competitive position is industry intelligence. This week showed both ends of the launch business: SpaceX catching an orbital upper stage while ULA lost its first mission and a customer's 40 satellites.
The investigation findings will matter most. What ULA learns about the Vulcan failure will decide how quickly Amazon, the Pentagon and NASA can rely on it again, while NASA's lunar framework and PAL's order show where long-term commercial demand is forming.
Sources and Evidence Notes
Vulcan failure and Amazon Leo (Nov 15): Space.com · The Next Web · StockAnalysis (Reuters summary) · IBTimes UK · Gadget Review
Starship Flight 15 (Nov 13-14): IBTimes UK · Latin Times · Fox San Antonio · New Space Economy
NASA CLPS 2 (Nov 7): NASA · Space.com · GovConWire · SpaceQ
Space Tech Expo Europe (Nov 17-19): Official site · The Flying Engineer · Space Tech Expo Europe preview
Philippine Airlines 787-10 (Nov 10-16): Airliner World · FlightGlobal · PortCalls · Business Traveller
Rocket Lab Q3 (Nov 9): Payload · SpaceQ · Rocket Lab release via Finviz
Evidence labeling: The Vulcan failure is a developing story with no stated cause. Starship's catch is confirmed by SpaceX and press reports; reuse of a caught ship is not yet demonstrated. The CLPS 2 $10 billion figure is a ceiling, and the assignment's list of seven companies omits Voyager Technologies. PAL's order is firm for 15 aircraft with purchase rights for five. Space Tech Expo Europe is reported from pre-show information. This briefing does not provide investment advice.
Reviewed by Erwin Castro
on
Tuesday, November 17, 2026
Rating:

No comments: